Authorities in Russia’s Kamchatka Krai have finalized plans to clear Kultuchnoye Lake in Petropavlovsk-Kamchatsky, according to the regional government. The water body is designated as one of the key sites in the regional capital’s development master plan.
Work crews plan to clear the lakebed using a dredger – a floating unit engineered to extract bottom sediments. The extracted slurry will be pumped through a dedicated pipeline to a depleted quarry on Petrovskaya Hill, where a specialized containment basin will be constructed to receive the material. Once separated and treated, the water will be returned to the lake.
Anna Sushentsova, the region’s Deputy Minister of Natural Resources and Ecology, noted that this operational method ensures the restoration complies with both environmental regulations and urban planning requirements. The project is scheduled to launch next year under the federal Water of Russia program, which operates as part of the Ecological Well-Being national project.
To prevent the infrastructure from disrupting local residents during operations, the slurry pipeline will be laid in a trench and buried under soil. Construction zones near the lake and the perimeter of the receiving quarry will be fenced off and equipped with informational signage, while the contractor will conduct daily inspections of the pipeline throughout the entire project.